frequently asked questions

   
   
1.
What are the goals/objectives of this proposed development?
2.
How much would it cost all up?
3.
What benefits would there be for the outsider, the church member and for the staff?
4.
Why don't we buy the house that's for sale on Church Street for additional accommodation/offices? (Instead of building something new.)
5.
Why would we need to do both parts at once? Could we split the development into 2 stages and do the Ministry Centre refurbishment first and then the new building once we've raised enough money and are clearer on the requirements for it?
6.
Why would we build residential units for staff? Isn't it better to keep staff accommodation as a variable cost (ie. rent) so it can be flexible according to the growth/decline of the church/staff? What about simply buying accommodation?
7.
Would current and future ministry staff really want to live onsite?
8.
Would the units be big enough for a family of 5–6?
9.
Would there be more meeting rooms, as there's often a shortage?
10.
What if ministers leave or new leadership affects congregational size? The church congregation could diminish and a smaller congregation would be left with a large financial burden.
11.
When would the proposed plans be submitted to the Council? If approved, when would the work start and finish? How would you manage overruns?
12.
Who has been consulted on the development of the plans to date?
13.
Where would the ministry team and admin staff be housed during the building work (1+ years)?
14.
I have some questions. When can I ask them directly to the church leaders?
15.
How would we to raise such a large sum of money? What's the plan?
16.
What happened to the money that was raised specifically for the St Thomas' Restoration Project a few years ago?
17.
What are the wardens most concerned about in launching this proposed project?
18.
What should we be praying for with regards to this project?
19.
How can members of the congregation help?
20.
How do I find out more?
21.
Is there a communication plan in place for how to keep the church informed and involved? Timings, fund updates etc?
22.
What has been the dialogue with the congregation regarding the Ministry Centre Project?
23.
Is the mortgaging of the pre-school site anything to do with the Ministry Centre Project?
24.
What is the current cost of the project and how is it intended to be funded?
25.
Why is the St Thomas' National Trust appeal funds being used?
26.
Why was Allen Jack and Cottier selected as the project architects?
27.
How much has been spent to date?
28.
What level of contingency are we planning?
29.
What capital funds do we have at our disposal to put towards this project?
30.
Do we plan to utilise capital funds which would otherwise be earmarked for property maintenance? If so what maintenance will need to be deferred?
31.
How will the project affect our operating cashflows e.g. rents for staff accommodation or disruption to car park revenues during the project?
32.
How much funding must be raised outside our available capital base?
33.
What should be our target fund raising timetable to reach the minimum funding commitment? Do we raise funds until we reach the required threshold or do we set a no/no-go deadline with the possibility that we do not reach the required threshold?
34.
What is the tax treatment of the funds we need to raise?
35.
Are there any further opportunities for the project to be made tax deductible?
36.
How will the project be managed?
37.
What are the next steps?
   

 

 

 

 

   
   
   
   
   

^

1.

What are the goals/objectives of this proposed development?

a.

The development is to better help people to know Christ, serve Christ, proclaim Christ. For this we need a safe, spacious and increasingly money-saving ministry centre for the church. In summary…MAKE SAFE - MAKE SPACE - SAVE MONEY. In detail:

i.

To make good the existing heritage-listed Ministry Centre, which is in a dangerously dilapidated state. The ground underneath the building has dried out, and the building is now tilting. The Centre is a 100 year-old house, so it is not wired for office facilities. We need to re-wire it to support computers, air-conditioning, lighting and other facilities required for a modern office. Whatever happens, this building has to be renovated.

ii.

To provide sufficient work and meeting space for the current Ministry team and flow-over rooms for congregational use. The current conditions are cramped, freezing cold or boiling hot, have insufficient storage, and there are not enough rooms available for ministers to work and meet in privacy with members of the congregation or outsiders. We mustn't forget that ministry is not like business. Often our ministers are dealing with people's extremely private and sensitive matters. To minister to us effectively, they need private meeting space.

iii.

To negate the significant cost and risk the parish currently faces from its requirement to provide rental accommodation for its Ministry Team. (In the region of $80,000 p.a. and rising) This is to be done by building attractive accommodation that can either be commercially rented or used by members of the Ministry Team.

 

 

The above three goals aim to use the land which we already own to meet our needs, rather than continuing to spend money on renting space on other people's land. By doing this St Thomas' will also be in a strong position for the future growth and wellbeing of its ministry.

 

 

^

2.

How much would it cost all up?

a.

The total cost of the project is estimated to be approximately $3.8 million with roughly one-third being the restoration of the current ministry centre and two-thirds being the construction of the new facility and accommodation. We are seeking to raise $2,500,000 in non-tax-deductible contributions. For more information see the Financial section of this website.

b.

The ground floor of the proposed new building would house the administrative team and two new meeting rooms, with flexible layouts. The first and second levels would contain units that could be used by staff or rented out commercially, depending on the staff profile at any given time.

c.

If the existing building's condition is not addressed in the near future we will have to move our Ministry Centre into off-site office accommodation at a cost of more than $150,000 pa. Without provision of residential accommodation, we will need to continue to rent residences off-site at a cost of more than $80,000 p.a. The proposed new development would therefore pay for itself in less than 20 years with a saving of about $230,000 (in current $) and reduced risk on off-site rental increases.

 

 

^

3.

What benefits would there be for the outsider, the church member and for the staff?

a.

One of the most exciting aspects of the proposed building is the new 'face' St Thomas' will project into the North Sydney Civic Park. It won't look like a church property but with a piazza at the front, our presence and the new facilities will enable us to really engage with the community and take advantage of outreach opportunities like the Friday noodle markets, the Saturday markets, etc.

b.

More meeting rooms, a piazza with BBQ facility, a fenced-in area for the children, and other facilities will allow easier congregational access and use that is simply not possible in the currently cramped and closed Ministry Centre.

c.

For the staff, the new facilities will provide modern, IT-equipped, air-conditioned offices (a combination of open-plan and private studies) that will enable the ministry team and admin staff to run our church and minister to the congregations more effectively.

 

 

^

4.

Why don't we buy local housing for additional accommodation/offices? (Instead of building something new.)

 

a.

The cost of acquiring the same accommodation and offices as planned by the project is much more than the cost of building them onsite. This is simply because the Parish already owns the land on which the development is to occur. We are therefore maximising the value of our existing asset.

 

 

^

5.

Why would we need to do both parts at once? Could we split the development into 2 stages and do the Ministry Centre refurbishment first and then the new building once we've raised enough money and are clearer on the requirements for it?

a.

The current Ministry Centre (once renovated) is insufficient for the existing ministry needs of the Parish – let alone meeting any future growth. For example, on Sunday mornings currently there are not enough rooms for all the Sunday School and youth groups, so we have to rent space in the North Sydney Community Centre. Building both stages at the same time significantly reduces costs and inconvenience during the construction period. Our architects estimate the additional cost of developing in two stages is approximately 30%. This equates to an extra $1,000,000 and does not take into account the significant ministry cost of working next to a building site for an extended period.

b.

The project's long term financial viability relies on the second stage being completed as soon as possible, as rental income from the units will reduce or provide offset to the Parish's large rental bill. Delays in construction of the new building will simply mean a more costly building requirement for the future.

c.

The ministry team and admin team have put a lot of thought into developing the requirements for the centre – based on existing and forecast ministry needs. Splitting the project into two will simply increase costs and create significant inconvenience and disruption to the Ministry at St Thomas' in the future. If we only renovate the Ministry Centre it will be insufficient to meet even the current ministry needs.

 

 

^

6.

Why would we build residential units for staff? Isn't it better to keep staff accommodation as a variable cost (ie. rent) so it can be flexible according to the growth/decline of the church/staff? What about simply buying accommodation?

a.

Rental savings are one of a number of significant benefits the development is anticipated to deliver. We currently spend approximately $80,000 per year in accommodation costs for the Ministry staff. Building our own accommodation would help to both remove the ongoing burden of this cost from the Parish, as well as eliminating our exposure to future increases in the rental market. Indeed, based on recent experience, it is not difficult to envisage a situation where the Parish can simply not afford to employ ministers because the cost of housing is too great.

b.

There are always staff like MTS apprentices and pastoral workers who work with us for 2–3 years and will benefit from the accommodation without being onsite long-term.

c.

Whilst buying accommodation is an alternative to building, the cost of construction is lower given the land does not need to be purchased. It is also important to point out that should the accommodation not be suitable or needed by Ministry staff; a new income stream would be available by renting the accommodation out externally.

   

^

7.

Would current and future ministry staff really want to live onsite?

a.

Even though one of our ministers does currently live on-site, it is quite possible that the future ministry staff will not want to live in such close proximity to the church. The design has incorporated comments from existing staff and we have had staff interest in moving into the accommodation. The design of the proposed building has also taken into account the requirement to disconnect the accommodation from the Ministry Centre. There would, for example, be a separate entrance for these units from North Sydney Civic Park that would make the units attractive as commercially rented accommodation, so for outsiders to live here it wouldn't feel like living on church property.

 

 

^

8.

Would the units be big enough for a family of 5–6?

a.

No. The largest unit in the proposed building has three bedrooms. In the instance one of our ministers has a family of this size, we would use the income from renting the units to pay for more suitable accommodation.

 

 

^

9.

Would there be more meeting rooms, as there's often a shortage?

 

a.

Yes. In the plans for the proposed building, there are two large meeting rooms with a folding wall between them. They measure some 30 sq m and 40 sq m and could be connected to form a contiguous space of some 70 sq m. They would adjoin a courtyard with some 30 sq m of permanent covered space. The largest meeting room has been designed to enable the full staff complement of 20 permanent staff to be able to meet comfortably around a table.

 

b.

The old Rectory/current Ministry Centre has been designed to be refitted with offices that would double as meeting rooms at peak times providing 7 small meeting rooms for up to 4–6 people to meet, and the former kitchen would be converted into a meeting room (10 sq m) suitable for 10–12 people. This would help to relieve some of the pressures particularly on Sunday and Tuesday mornings.

 

c.

In addition, there would be attractive new outdoor spaces that will be useful for engaging with the local community during such times as the Friday Noodle or Saturday markets.

 

 

^

10.

What if ministers leave or new leadership affects congregational size? The church congregation could diminish and a smaller congregation will be left with a large financial burden.

a.

Our responsibility is not to plan for less effectiveness but more effectiveness as God blesses His word. And the need is upon us.

b.

The financial viability of the proposed project actually rests on the accommodation being constructed. This development maximises the value of the site and creates an income stream (akin to the carpark income stream), that would support ministry activity into the future. In this sense, the project is even more critical to undertake now in the event that there is a change in the ministry team in the future.

c.

In 2010/2011 we intend to seek pledges of financial support into the future with the aim of minimising any long-term financial burden to the church.

 

 

^

11.

When will the proposed plans be submitted to the Council? If approved, when would the work start and finish? How would you manage overruns?

a.

The proposed plans have recently been submitted to North Sydney Council.

b.

The development is proposed to commence in early 2011 and take one year to complete. What a cause for thanks were the Project to be competed by Christmas 2011.

c.

Once approved by North Sydney Council, a detailed tender will be prepared by the architects using extensive information available on the condition of the old building and all aspects of the site including existing services location and geotechnical information. The project will be tendered to at least three competent building companies on a fixed price and time contract with suitable bonds and guarantees. This arrangement will ensure minimal risk of cost alterations after contract award.

 

 

^

12.

Who has been consulted on the development of the plans to date?

a.

Any renovation and development of church property requires significant consultation with both internal and external parties. Before seeking congregational feedback we, the Ministry Centre Project Team and Wardens, have looked at the needs and possibilities with those who most use the site, then the appropriate authorities in church, diocese and council. More specifically:

i.

the ministry team to ascertain requirements.

ii.

the Parish – concept plans were first presented for feedback to the Parish in March 2008 at the Annual Vestry meeting.

iii.

the National Trust of Australia (NSW).

iv.

the Sydney Diocesan Architectural Committee who have final say on any development / renovation.

v.

North Sydney Council officers and the North Sydney Mayor, Genia McCaffrey.

vi.

the architects, structural engineers, traffic engineers, quantity surveyors, mechanical and electrical engineers, heritage advisors and town planners.

viii.

We originally posted the building plans at the back of the church in June 2008.

^

13.

Where would the ministry team and admin staff be housed during the building work (for 1+ years)?

a.

There is a 'Re-housing' project as part of the overall project plan. Rod Hills and Willi Schultheis are leading that work to determine the most sensible and cost-effective approach. One option we are looking at is demountables, another is to use some of the rooms around the property such as the rooms in the vestry at the back of the church and the Conference / Meeting Rooms in the Memorial Hall. As that plan is developed we will keep you informed via this website.

 

 

 

14.

I have some questions. When can I ask them directly to the church leaders?

a.

There will be opportunities announced in the newsletter for question and answer sessions with the wardens. There will be information available on this Website with an on-line Feedback/Question facility, as well as a Question Box located at the back of the church.

 

 

^

15.

How would we raise such a large sum of money? What's the plan?

a.

We are going to approach this on 3 fronts in 2010/2011.

 

i.

Pledges from the congregation during 2010/2011.

 

ii.

Bequests – asking members of the congregation to include St Thomas' in their will.

 

iii.

Any other ideas you have for how you and others could contribute, please email via this website or drop a note in the Question Box at the back of church.

^

16.

What happened to the money that was raised specifically for the St Thomas' Restoration Project a few years ago?

a.

We raised $1,300,000 over 3 years which was used to upgrade the Memorial Hall and repair the school house and the church roof. In the fund there remains approximately $600,000 which will be put towards this new project.

 

 

^

17.

What are the wardens most concerned about in launching this project?

a.

That the donations will come in slower than they need to and if that happens it will raise the costs of financing the project. We really hope and pray that our people see the need for this work and work with us to make it happen during 2010/2011.

 

 

^

18.

What should we be praying for with regards to this project?

a.

That the plans go smoothly through Council.

b.

That people at St Thomas' are aware of the many blessings that God has given them and are willing to make financial sacrifices for the benefit of the church and its work to know, serve and proclaim Jesus Christ.

c.

That everyone at St Thomas' will get involved in some way. This is a wonderful opportunity for us to work together, to serve together, to give together to equip our church with the facilities we need to proclaim Jesus inside our church and outside in our community.

 

^

19.

How can members of the congregation help?

a.

You can help us by reviewing the proposed building plans and ‘Frequently Asked Questions’ and giving your feedback or questions to the Wardens by:
– completing an on-line Feedback Form on this website
– sending an email to buildingproject@st-thomas.org.au
– writing to the Wardens (you can send a letter by post or drop one in the mailbox at the back of the church).

b.

Please start to consider how you could support the process financially. We could beat our $2m target if, on top of regular offertory giving, every young person (200) contributed $450 over 3 years (ie $150/year ie. $13/month ie. $3/week) and every church household (500) contributed a minimum of $4500 over 3 years (ie. $1500/year, ie $125/month, ie. $30/week). Please prayerfully consider what you could sacrifice to give to this work which will enable our ministry to grow.

 

c.

Giving your time and ideas next year to support additional fundraising.

d.

Praying for the points above.

 

^

20.

How do I find out more?

a.

Check this website for updates: www.st-thomas.org.au/buildingproject/

b.

Attend one of the 'After-church Information Sessions' being run by the Wardens. (Look out for details in the Bulletin.)

c.

Talk to the Wardens – Peter Hicks (10am), John Webster (10am & 7pm), Martin Dudley (10am)

 

 

^

21.

Is there a communication plan in place for how to keep the church informed and involved? Timings, fund updates, etc?

a.

Details of progress will be provided regularly on this website and through the Weekly Bulletin.

 

 

^

22.

What has been the dialogue with the congregation regarding the Ministry Centre Project?

 

a.

The Ministry Centre project has been the subject of Parish Council and Vestry Meeting deliberations for several years. At the March 2009 Vestry Meeting, the architects Allen Jack and Cottier architects presented the plans to the vestry meeting prior to them being submitted to North Sydney Council for the first DA which has been subsequently amended and approved. The church website has contained details regarding the Ministry Centre project at least since July 2008 and an excerpt is on the website from this date.

 

b.

In around July, 2010 as a result of the DA being approved a new section of the website was established with a substantial amount of information including the actual DA drawings, the DA conditions, a letter from the Rector and FAQ's.

 

c.

In September, 2010 the wardens presented on two Sundays to the congregations and provided answers to any queries raised.

 

d.

Every Parish Council meeting discusses the project and its current status.

 

e.

Several editions of the "Parish Council Update" newsletter have had information on the project.

 

f.

All project expenditure by the Parish is reviewed by the Parish Council regularly and all expenditure requires the endorsement of two wardens and is subsequently reviewed by Parish Council.

   

^

23.

Is the mortgaging of the Preschool site anything to do with the Ministry Centre Building Project?

 

a.

The mortgage of the pre-school site is unrelated to the Ministry Centre building project and is linked with the renewal of the Prechool playground which was required due to safety issues with the old playground.

 

b.

The wardens posted a notice on the entry to the church for several weeks during June, 2010, attended services and announced the intention to take out a mortgage. There were no objections raised to the mortgage as a result of these representations.

 

c.

The mortgage was approved unanimously by the Parish Council.

 

d.

The original intention, as advised by Westpac, was to use the pre-school lease as security over the loan for the playground. The pre-school Board therefore advanced the project and the Wardens and Parish Council gained Diocese architectural approval for the project. The project was always being funded by St Thomas pre-school (not the Parish), utilising fee income from pre-school fees. Subsequently the bank sought a mortgage over the land and the Parish Council decided to take out a loan and pass all the fees through to the pre-school via an increased lease charge. This is currently in progress with the Diocese having passed the necessary legal approval and the bank loan presently being under negotiation.

 

 

^

24.

What is the current cost of the project and how is it intended to be funded?

 

a.

A cost estimate of $3.8m has been on the website for several months and was established by the architects prior to the latest DA change. Once the DA was approved the Parish Council endorsed the engagement of a Quantity Surveyor (QS) who has established an initial estimate of approximately $4.5m which is presently the subject of due diligence by the Ministry Building Committee. The QS estimate is very detailed and is we believe an upper limit.

 

b.

The Parish Council has considered a report by the Parish Council finance sub-committee that provided a finance plan that could see the development proceed utilizing the National Trust appeal and loan funds. The Parish Council will reconsider this strategy once the QS estimate is finalised, the tender documents are finalised, the finance strategy reviewed, the appeal committee established and prior to seeking tenders. This is expected to be in late 2010.

   

^

25.

Why is the St Thomas' National Trust appeal funds being used?

 

a.

The St Thomas' National Trust appeal raises funds for the restoration of all the St Thomas' heritage buildings. Funds from the appeal have been spent on the Schoolhouse, Memorial Hall and the Church. It is not an exclusive church building appeal and over recent years the Parish Council have specifically stated in its annual letters that the appeal money will be directed to the Ministry Centre project. The National Trust funds can only be used for the restoration portion of the project (circa $1.5m) not the new building portion.

 

 

^

26.

Why was Allen Jack and Cottier selected as the project architects?

 

a.

Allen Jack and Cottier have been working on the St Thomas' site for over a decade and were the architects for the renovations of 34 McLaren Street, the Memorial Hall and the Preschool. They bring unparalleled knowledge of the site and their costs are in accordance with industry standard. Their appointment was endorsed by Parish Council.

 

 

^

27.

How much has been spent to date?

 

a.

We have spent about $200k over an extended period of time essentially master planning the site and in response to issues raised by the Diocese. Approximately the same level of funds are currently being spent developing the detailed tender documents required to ensure accurate and competitive tenders are procured.

 

 

^

28.

What level of contingency are we planning?

 

a.

We will plan circa 10% contingency (or as recommended by Quantity Surveyor and architect) post the award of the tender.

   

^

29.

What capital funds do we have at our disposal to put towards this project?

 

a.

The National Trust amount is circa $800k. This fund has regularly received donations of circa $200k per annum so it is envisaged that during or shortly after the construction period of the project the National Trust fund will receive sufficient funds to entirely fund the restoration part of the project (circa $1.5m).

 

 

^

30.

Do we plan to utilise capital funds which would otherwise be earmarked for property maintenance? If so what maintenance will need to be deferred?

 

a.

The Parish Council frequently defer maintenance tasks in favour of mission and staff. Once the National Trust fund is fully allocated to the restoration part of the Ministry Centre any funds donated to the fund will return to fund property maintenance elsewhere on the property.

 

 

^

31.

How will the project affect our operating cashflows e.g. rents for staff accommodation or disruption to car park revenues during the project?

 

a.

A detailed finance committee report has been made available to Parish Council on this issue. It is expected that 15 car parking spaces will be permanently removed and we are currently assessing the temporary impact of the project.

 

 

^

32.

How much funding must be raised outside our available capital base?

 

a.

It is our intention to use the National Trust funds to immediately pay approximately 20% of the capital costs and to borrow the remaining 80%. The borrowed funds will be retired over time through fund raising, savings in rental costs and further National Trust giving. In the meantime interest costs can be met from present cashflows.

   

^

33.

What should be our target fund raising timetable to reach the minimum funding commitment? Do we raise funds until we reach the required threshold or do we set a no/no-go deadline with the possibility that we do not reach the required threshold?

 

a.

Our plan is not to defer the project because building costs, rentals, etc, will continue to rise and make the project more expensive over time. Building costs are expected to increase significantly in the medium term whilst at present they are not under much pressure. It is our intention to commence construction as soon as possible to support the mission of the church.

   

^

34.

What is the tax treatment of the funds we need to raise?

 

a.

The Finance Committee is exploring whether tax-deductibility is possible for the meeting parts of the new structure but the heritage parts of the project are definitely tax-deductible.

   

^

35.

Are there any further opportunities for the project to be made tax deductible?

 

a.

It is possible that the building of meeting rooms may also be tax-deductible as an education component of the project. This is being investigated.

   

^

36.

How will the project be managed?

 

a.

It is our intention to engage a single, competitively sourced builder for the project. The builder will be managed utilising an appropriate mix of professional assistance from our architects and available project management resources from the congregation.

   

^

37.

What are the next steps?

 

a.

There is a lot of work going on principally to settle the detailed tender and finance plan. These will be presented to Parish Council prior to seeking tender responses early in 2011. At that time Diocese and bank approval will need to be sought for the next project stage and financing. Once these are in place and an appropriate tender is selected we will then be in a position to again report to Parish Council on whether or not to appoint a builder. This is expected to be around mid-2011.

     

^

 

   
   
     
 
 